Tar Sands in Vermont? No Way!

Jan 29, 2013 by  | Bio |  1 Comment »

photo courtesy of someones.life @ flickr.com

I joined with residents of Vermont’s Northeast Kingdom today and fellow environmental colleagues to protect Vermont from the devastation of tar sands oil.

We filed a legal action to ensure Vermonters have a say over any proposal to move tar sands through Vermont. See press release here.

The request asks that the increasingly imminent proposal to move tar sands through an existing Northeast Kingdom pipeline be subject to state land use (Act 250) review. See request here.

Tar sands oil poses unique risks to the many natural treasures of the Northeast Kingdom and also imposes extreme climate change risks.

Tar sands oil is a gritty tar-like substance that produces far more emissions than conventional oil. The vastness of the tar sands reserves in Western Canada means that using tar sands oil delays efforts to move towards cleaner energy supplies, and sends us backwards on climate change.

As James Hansen, a leading climate scientist has said, the exploitation of tar sands on mass will be, “game over” for the climate.

Already there are requests to move tar sands east from Alberta to Montreal. The only realistic way to move it beyond Montreal to the deep ports it needs for transportation is through the Portland Montreal Pipeline which passes through Vermont.

There has already been one spill in this old pipeline in Vermont. A spill of tar sands oil – which is much harder to clean up – would be devastating.

Our filing requests that any plans to use the pipeline for tar sands oil be reviewed though Vermont’s land use development law – Act 250 – to protect our land, water and air resources threatened by this dirty fuel .

The Time is Right for Affordable Heat

Jan 17, 2013 by  | Bio |  Leave a Comment

Vermont is poised to take a big bite out of the high cost and pollution of heating our homes and businesses. Slashing a full one-quarter of both lies within our reach.

Over the past decade, the cost Vermonters pay for staying warm has more than doubled. This strains our pocketbooks, our environment, our health and our security. Watching our dollars go up in smoke drains our economy.

What can we do? Building on the enormous success of our electric efficiency efforts, we can improve the heating efficiency of our homes and businesses in a similar manner. While some efforts have begun, most of the savings opportunity remains on the table. Throughout Vermont, heating efficiency has saved the average homeowner about $1,000 a year.  (See a recent editorial here).

A new report of Vermont’s Thermal Efficiency Task Force provides a strong roadmap for jumpstarting heating efficiency and renewable heat for our homes and businesses. The Task Force recommendations show how Vermont can stretch its heating dollars farther and provide over $1.4 billion in direct savings. That’s $1.4 billion that is not going up in smoke, literally leaking out of our homes and businesses.

Affordable heat means lowering bills. Every year Vermont struggles to fund low income heating assistance (LIHEAP). With affordable heat, Vermont can reduce the funds needed and can use LIHEAP dollars to help more Vermonters. Cutting fuel use by one-quarter means that for every four homes that are weatherized, help is available for one additional family.

Affordable heat reduces pollution. Every gallon of fossil fuel we don’t burn means less pollution. Whether we are adding solar to our roofs or insulating/weatherizing our homes we leave a lasting positive legacy for our children by taking seriously our responsibility to tackle climate change and reduce pollution.

The long and short of it is that Vermont — and Vermonters — can’t afford to keep wasting energy, wasting money and wasting clean air. Vermont’s commitment to affordable heat is our ticket to more comfortable homes and businesses, and a thriving and affordable clean energy economy.

The Dicey Economics of Hosting a Nuclear Plant

Jan 16, 2013 by  | Bio |  1 Comment »

photo courtesy of topher76@flickr.com

This past week has shown Vermont first-hand the high cost of nuclear power. Hosting a plant in your state is clearly a high-stakes bargain.

Vermont went to Court in Manhattan this week before a three judge panel at the United States Court of Appeals. (Read more here and here). It had fifteen minutes for its lawyer to explain to the judges why the decision of the District Court blocking the actions of the Vermont Legislature should be reversed. A tough task.

With clarity and nimbleness, Vermont proved it was up to the task. Its lawyer, Attorney David Frederick, an experienced appellate lawyer who argued a case last week before the United States Supreme Court, explained that Vermont has every right to determine Vermont Yankee’s fate. And doing so does not impinge on the federal government’s oversight of radiological issues.

In a nutshell, there were three points.

First the United States Supreme Court case from 1983 that let stand a California law enacting a moratorium on nuclear plants would allow the Vermont law. If a state can ban all nuclear plants, it can certainly allow the Legislature to determine the fate of one plant.

Second, the lease on Vermont Yankee expired and like a landlord, Vermont can simply refuse to renew the lease. Period. Any tenant knows this. Vermont is hosting this plant and can say it wants the property used for another purpose.

Third, Vermont has huge skin in the game and economic exposure from Vermont Yankee. If Entergy, the owner of Vermont Yankee, goes bankrupt or simply chooses to walk away, Vermonters are left holding the bag for what Conservation Law Foundation has described as the nuclear equivalent of junk car in its backyard. This possibility is more likely following recent reports that Vermont Yankee is not pulling its weight and that Entergy would be better off closing the plant.

The stakes are high. Apart from hosting this plant, Entergy is seeking to recoup over $4 million in legal fees, and now has four law firms working to push every legal angle possible. Times change. When Vermont first approved the Vermont Yankee facility in the 1970s, there was a hearing for three days before the Vermont Public Service Board. Clearly nuclear power and hosting plants is more expensive and time consuming than ever.

Vermont is right to begin extracting itself from this nuclear legacy. Unfortunately, that is proving to be not so easy.

Another Blown Deadline: For Now, No “New Route” for Northern Pass

Jan 3, 2013 by  | Bio |  Leave a Comment

New Year's Eve in Times Square (photo credit: flickr/Mondayne)

The ball and other ceremonial objects have dropped, and 2013 has arrived. Although we mark the turn of the year with champagne, Auld Lang Syne, and a bevy of news stories and year-end blog posts, there’s not much genuinely “new” about the New Year. We hang a new calendar and start writing 2013 on legal briefs and checks (as the case may be), and life goes on.

Here in New Hampshire, the developer of the Northern Pass transmission project celebrated New Year’s Eve without any year-end changes. As revelers made their way to New Year’s Eve parties, in a classic “news dump” to minimize attention, Northern Pass Transmission LLC (NPT) posted a cryptic “project update” to its website. The update stated:

[W]e have identified a new route in the North Country that we will submit to the New Hampshire Site Evaluation Commission [sic] in the future for consideration and review.  We are in the process of finalizing this new proposal and will soon be prepared to announce its specific details….

We also recognize that while we are communicating with local citizens, stakeholders and public officials across New Hampshire, there is still much that can be done.  We believe this communication and dialogue is critical to the ultimate success of the new route and the project overall and felt it was necessary to take some additional time to continue these efforts before we publicly announce the new routing proposal.

In other words, NPT and its parent company Northeast Utilities (NU) had nothing new to announce, and the public will continue to wait for actual details and updated regulatory filings. And it’s not the first time Northern Pass’s developer has failed to deliver on its promise of a new route.

In May, NU set an August deadline for a route announcement; in July, NU set a September deadline; and throughout the fall, NU promised to finalize a route and file an updated Presidential Permit application with the U.S. Department of Energy by the end of the 2012, even going so far as to say that it had already obtained 99% of the land it needs. In this context, the Concord Monitor aptly reported on the New Year’s Eve “update”: Northern Pass misses deadline to unveil new route.

While NPT’s non-announcement wasn’t a surprise to CLF or others following the project closely, it was an important moment. It was, most of all, an embarrassing setback – the latest blown deadline after a series of blown deadlines stretching back to April 2011, when NPT decided to seek out a “new route” for the northernmost portion of the project.

NPT has been banking on its capacity to pay above-market land prices for a transmission corridor in the North Country. So far, the Society for the Protection of New Hampshire Forests, its supporters from more than two hundred New Hampshire towns and cities and also from around the region and country, and a number of courageous landowners unwilling to sell at any price have achieved remarkable success in blocking NPT’s efforts on the ground, property-by-property. It would appear NPT’s confidence was misplaced.

For NU executives and investors, Hydro-Québec, and Northern Pass enthusiasts in southern New England, the project’s latest blown deadline should be a wake-up call.

It’s not working.

Not NPT’s back-room strategy to assemble a serpentine series of parcels for a new transmission corridor in the North Country, without any meaningful changes to the project’s design or the southern 80% of its proposed route.

Not NPT’s attempts to game the federal permitting process in its favor.

Not NPT’s bogus claims of environmental and economic benefits for New Hampshire and of wide support for the project.

Not NPT’s campaign to discredit affected citizens in the nearly three dozen communities that have declared opposition to the project and the entire New Hampshire conservation community as “not in my backyard” types and “special interests.”

In the New Year, Northern Pass’s developers should recognize that half of the “dialogue” they are promising is listening. The latest blown deadline should signal, loud and clear, that the current Northern Pass proposal won’t be successful, new route in Coös County or not.

Natural Gas Leaks: A Risky Business In Need of a Fix

Jan 3, 2013 by  | Bio |  2 Comment »

A few weeks ago, Springfield, MA, was rocked by a natural gas explosion that destroyed a building, ruined a city block, and was hailed as a miracle because no lives were lost.

The pipelines that lie below our communities, always out of sight, came suddenly came into focus. The explosion reminded us of the sobering reality that our streets are not always safe. Despite smart investments in energy efficiency and new energy technologies in New England, when it comes to natural gas, whose infrastructure is among the oldest in the nation, we have been reluctant to prioritize investment in replacing and repairing the pipes and valves that we rely upon not only to heat and power our homes, but to keep us safe.  When it comes to natural gas efficiency and investment, there is much more we can do – so much more.

We need to improve safety, increase efficiency, and reduce the risk to communities and to our planet. It is my belief, as well as that of my colleagues here at CLF, that we can and should make our communities healthy and safe from the unnecessary risk of explosions from old and leaky pipelines. This is vital, for two reasons.

It’s vital because methane, the major component of natural gas, is 25 times more potent as a global-warming causing gas than CO2. In a year that has broken so many temperature records, and in an age when climate is showing the signs of human distortion, we are constantly reminded of the strain we are placing on our global ecosystem. It is a strain we need to urgently reduce.

It is also vital to replace and fix pipes leaking natural gas because it is so combustible. Springfield reminded us of this fact. So too did the explosions that that rocked San Bruno, California in 2010, Allentown, Pennsylvania, in 2011, and Gloucester, MA in 2009, and most recently, Sissonville, West Virginia, to name only a few. These explosions are reminders of the serious care and attention that our natural gas infrastructure needs. If we fail to provide them with that care, we gamble with our safety, and with our lives, as this image from the San Bruno explosion vividly shows.

As my colleague Shanna Cleveland recently said, “The need for action is particularly acute in Massachusetts where over one-third of the system is considered ‘leak-prone’—made up of cast iron or unprotected steel pipe.” The leaks in Massachusetts are so significant that the gains by efficiency programs put in place by Massachusetts regulators are disappearing into thin air. A report released by CLF by that name (Into Thin Air, available to download for free here) documents how these leaks, known as “fugitive emissions,” are being borne not by the utilities, or by the regulators, but by consumers. Utilities pass the cost of lost gas onto ratepayers to the tune of $38.8 million a year. Here’s an infographic from that report:

Another report by Nathan Phillips of Boston University combines Google Earth and research into a compelling visualization of just how prevalent these leaks are.

Like the explosion in Springfield, Nathan’s map documenting the 3,356 separate natural gas leaks under the streets of Boston reminds us that, as we walk or drive down the street, we are often driving through an invisible cloud of natural gas leaking from aging pipes. If you are like me, to accept the avoidable risk of a predictably volatile gas is deeply unsettling.

With the exuberance for cheap, domestic natural gas on the rise, proposals for new massive interstate pipelines are in the works. Houston-based Spectra, a natural gas pipeline company, is proposing a $500 million expansion for Massachusetts alone. Before we go down that route, I would like to make three simple suggestions.

1) Whether the natural gas industry ever delivers on its claim of being more environmentally friendly than coal or oil depends on how well natural gas infrastructure addresses leaks. We develop more accurate tools for assessing the greenhouse gas emissions from pipelines.

2) Not only is investment in new pipelines and power plants expensive, but it comes with serious and lasting environmental consequences whose costs are too often discounted or ignored.  Before we blindly rush ahead with investments to expand, we need to look closely at the full range of costs.

3) Finally, we would do well to remember the lessons we have learned so well about the environmental and financial benefits of looking to efficiency first. Efficiency, both in the traditional sense of reducing our use of natural gas, and in the sense of maximizing the efficiency of our existing natural gas infrastructure by replacing outdated infrastructure and repairing leaks will reduce risk, reduce costs, reduce environmental impacts and put people to work throughout the region.

As the explosions in San Bruno, Gloucester, Allentown, and Springfield have reminded us, this is about the safety of our communities. We should not let promises of short-term profit in new projects trump both the near-term risk of thousands of leaks and the long-term sustainability of this region and stability of our climate.

Ignoring leaky natural gas infrastructure is risky business. Let’s fix what we have, and maximize our efficiency gains, before aggressively expanding. We’ll be more sustainable, and safer, that way.

 

The Latest on Northern Pass: A Year-End Roundup

Dec 28, 2012 by  | Bio |  Leave a Comment

As CLF begins a third year of advocacy on the Northern Pass project, some updates are in order:

The “New Route” Drama

With 2013 only days away, it is looking more and more likely that Northern Pass Transmission LLC (NPT) will not have secured 100% of a “new route” for the project’s northernmost portion by year end, as its public statements have been promising for months. As chronicled in a Boston Globe front-page story published earlier this week (the national daily’s first major story on Northern Pass), landowners are rejecting repeated offers from NPT, and our friends at the Society for the Protection of New Hampshire Forests have secured agreements to conserve key parcels along what appears to NPT’s preferred new path. (According to report in yesterday’s Union Leader, NPT officials are readying some kind of “update” on the project’s progress, which may raise more questions than it answers.)

If NPT fails to make good on its promised “new route,” it will be a singular embarrassment and signal more wasted months of self-inflicted delay. It also will continue NPT’s troubling pattern of misleading investors and peddling falsehoods about the project.

Whatever the success of NPT’s attempt to buy a transmission corridor through New Hampshire’s North Country, Northern Pass overall will remain the same flawed proposal that affected communities and stakeholders have overwhelmingly rejected over the last two years. Susan Arnold of the Appalachian Mountain Club and I penned an op-ed with this message, and it was widely published in New Hampshire newspapers this month. Please take a moment to read the op-ed here.

NU’s False Statements Get Noticed

Over the last month, the Boston Globe, the Concord Monitor, Connecticut newspapers, and NHPR (complete with audio) published stories on Northeast Utilities CEO Tom May’s blatantly false statements about support for Northern Pass. Instead of correcting the comments, NU’s spokesperson compounded Mr. May’s misstatements by insisting, contrary to any possible interpretation of the comments, that Mr. May was speaking about support for the Cape Wind project – a renewable energy proposal backed by a strong public campaign that is co-sponsored by many of the region’s environmental groups. The contrast with Northern Pass couldn’t be starker.

A Broken Permitting Process

The Department of Energy’s permitting process for the Northern Pass project remains tainted by its abdication of responsibility to select an independent and impartial contractor to prepare the crucial environmental impact statement for the project. In a recent letter to Senator Shaheen, DOE repeated its prior position that it sees nothing wrong with the way the current contractor team was selected because NPT’s extraordinary role in the selection process was not unusual. As I explained in October, a precedent of repeating a mistake is no justification. In November, CLF filed a new Freedom of Information Act request to understand the activities of the contractor team, DOE, and NPT during the last year and the extent of NPT’s influence over the direction of the permitting process.

An Underground Alternative Emerges

Meanwhile, we are learning more about a realistic alternative to NPT’s current proposal that could address some community concerns and provide new public revenues. In November, a state legislative commission released an important report highlighting the feasibility of siting underground high-voltage transmission lines in state-owned transportation corridors. The report can be found here (PDF) and followed a lengthy process of collecting testimony and input from dozens of stakeholders, including CLF and a number of other conservation organizations. The report found that underground transmission technologies and corridors are “being used extensively throughout the U.S. and internationally,” “may increase the reliability and security of the electric transmission system,” and “may be technically and financially competitive with other transmission designs and locations.” The commission pointed to other pending transmission projects that incorporate underground technologies sited in state-owned transportation corridors as an indication that this approach “can be technically and financially viable.” (Earlier this week, New York officials recommended approval of one of these projects – the Champlain Hudson Power Express between Québec and New York City, which now includes more than 120 miles of underground high-voltage transmission in active railroad corridors and highways.)

While the state agency officials participating in the commission were reluctant to endorse specific policy proposals in the report (which they saw as outside the commission’s charge), many commission members emphasized the need for a proactive, comprehensive energy plan and a regulatory framework that would help New Hampshire assure that new transmission projects provide meaningful public benefits.

A majority of the commission’s legislator members recommended changes to the state siting process for energy projects, including a requirement that a transmission developer bring forward an underground alternative to any overhead project. It is expected that these recommendations will be among the many legislative proposals to amend the state siting law during the 2013 session of the New Hampshire legislature.

*             *             *

What will 2013 bring for the Northern Pass project and New Hampshire’s energy future? Stay updated by signing up for our newsletter Northern Pass Wire, and be sure to check in with CLF’s Northern Pass Information Center (http://www.clf.org/northern-pass) and all of our latest Northern Pass posts on CLF Scoop. You can also follow me on Twitter, where I often point to recent news articles on Northern Pass.

This Holiday, New Hampshire Will Buy a $128 Million Lump of Coal

Dec 18, 2012 by  | Bio |  Leave a Comment

photo credit: TimothyJ/flickr

Today, the New Hampshire Public Utilities Commission takes up PSNH’s request to charge its customers 9.54 cents per kilowatt hour for electric energy service in 2013. In a op-ed published this week, long-time CLF friends Ken Colburn and Rick Russman explain why New Hampshire’s crisis of escalating PSNH rates – and how New Hampshire policymakers resolve it – may be the defining economic issue for New Hampshire’s new class of leaders next year.

With PSNH’s rates to be by far the highest in the state and almost three cents higher than those of its sister utility NSTAR in Massachusetts, New Hampshire is dealing with an untenable situation: small businesses and residents are subsidizing PSNH’s above-market costs to operate and maintain dirty, inefficient, and uneconomic coal plants, to the tune of $128 million.* The average residential customer will pay $212 extra in 2013 for the dirtiest energy in the region.

To put $128 million in perspective, in 2011 New Hampshire invested less than a seventh of that amount, a mere $17.6 million, in electric energy efficiency programs – an energy solution that is lowering rates, reducing pollution, avoiding expensive new transmission projects, and creating jobs.

New Hampshire energy users are in effect giving this money away to keep alive New Hampshire’s biggest sources of toxic and greenhouse gas pollution (even though PSNH projects they will only operate at around 25% of their capacity in 2013) and to pay dividends to PSNH’s owner, New England mega-utility Northeast Utilities. And the situation will only get worse with time as PSNH customers join the thousands who have already picked an alternative energy supplier, leaving a shrinking base of customers to bear the heavy costs of PSNH’s coal fleet. (If you’re still a PSNH customer, you should definitely make the switch before the new year begins and PSNH’s new rates kick in.)

The blame for this economic and environmental travesty lies squarely with PSNH’s self-serving failure to plan for the future.

Yet PSNH is already trying to make the case that it needs a “fix” from the New Hampshire legislature to protect its coal plants, its 10% profit margin guarantee, and its protection from cleaner, cheaper competition. What’s even more bizarre – and indicative of its refusal to approach these issues honestly – is that PSNH is pinning its skyrocketing rates on the very factors that have reduced electric rates for everyone else in New England – namely, investments in energy efficiency and environmental protection and the increasing use of natural gas and competitive renewable energy sources. PSNH’s foolhardy but lucrative investments in its outdated power plants – for which it fought tooth and nail over the last decade – are the culprit, not environmental requirements that apply to all power plants in New Hampshire and across the region.

Please take a moment to read the op-ed and share widely with friends, neighbors, and especially your new representatives in Concord. For the good of the state’s economic and environmental health, they need to hear from you!

*  The math: PSNH customers will pay a 2.85 cent “premium” for every kilowatt hour over and above PSNH affiliate NSTAR’s market-based rates, and PSNH is projecting that it will sell more than 4 billion kilowatt hours of power to its remaining customers in 2013. The average household in New Hampshire uses 7,428 kilowatt hours per year.

PSNH's Merrimack Station

Storm Clouds Gather Over Brayton Point

Dec 14, 2012 by  | Bio |  Leave a Comment

Frank C. Grace, www.trigphotography.com

Frank C. Grace, www.trigphotography.com

Coal-fired power is dying, not only across the nation, but across New England as well.  The region’s coal-fired power plant fleet has started to succumb to the costs of operating a coal-fired dinosaur in the age of energy efficiency, growing renewable electricity generation, and–for now–low natural gas prices.

Predominantly coal-fired Brayton Point Station in Somerset, Massachusetts, is the state’s largest single source of carbon emissions (producing over 6 million tons in 2010). Another harmful pollutant emitted by Brayton Point is particulate matter, which is measured daily by monitors that continuously check the opacity of the soot coming out of the plant’s smokestack. Brayton has been violating their limits for emitting that soot, and failing to monitor their emissions of several other harmful pollutants. Yesterday, CLF filed a notice of intent to sue Brayton’s current owners, Dominion Resources, for those violations. CLF’s upcoming lawsuit is just the latest in a growing list of bad news for Dominion and Brayton Point.

As New England’s other coal plants started to close or teeter on the edge of closure, Brayton Point Station was expected to be the last coal plant standing in the region. It is New England’s largest coal-fired power plant, and in the past decade its current owners, Dominion Resources, sank over $1 billion in pollution control upgrades into the behemoth. While Brayton Point does not have the kind of legal protection from market realities that PSNH exploits to prop up its dirty old coal generation in New Hampshire, many had assumed that Brayton Point was well-positioned to survive in the changing power generation landscape.

source: EPA and ISO-NE data

But the relentless pressure of low natural gas prices and the costs of starting up and operating an enormous coal-fired power plant have begun to affect every corner of the coal generation market in New England, and Brayton Point has not been spared. The plant’s “capacity factor,” which reflects the amount of power the plant generated compared to the amount of power it could have generated if used to its full potential, has taken a nosedive over the past three years. A plummeting capacity factor means that it is a better economic choice for a plant’s owners to keep it idle most of the time than to operate.

Dominion Resources, clearly, has seen the writing on the wall for coal in New England. After signing a binding agreement to cease coal operations at Salem Harbor Station as a result of CLF’s lawsuit against that plant, Dominion sold the Salem plant earlier this year. Following closely on the heels of the Salem sale, the company put Brayton Point on the market in September. While Dominion is marketing Brayton as a modern coal-fired power plant due to its recent billion-dollar pollution control investments, UBS recently assessed [PDF] the value of those investments (and the plant itself) at zero.

Brayton Point’s plummeting capacity factor and bleak sale prospects reflect both the current power of low natural gas prices and the weakness of these old, out-dated coal plants.  That trend will continue as the New England energy market continues to move forward with better integration of efficiency, conservation and renewable generation. Dark clouds are rising over Brayton Point. In the meantime, CLF and our partners will work diligently to hold the Brayton Point power plant accountable for producing its own dark clouds of pollution in violation of the law.

Distributed Generation Standard Contracts Act: A Success in Three Parts

Dec 13, 2012 by  | Bio |  Leave a Comment

On June 26, 2011, Governor Chafee signed into law the “Distributed Generation Standard Contracts Act.”  The bill had passed both houses of the General Assembly unanimously. The “distributed generation” in the title of the law refers to small, local renewable energy projects.

The new law was designed to do three things: (1) increase the number of small renewable energy projects that are built in Rhode Island; by (2) making it easier, quicker, and cheaper for developers of these projects to get contracts to sell their electricity to Rhode Island’s dominant utility, National Grid; and (3) get those renewable energy projects distributed into more of Rhode Island’s cities and towns.

Not every law passed by the General Assembly works out the way it was meant to, but the Distributed Generation Standard Contracts Act has been phenomenally successful in accomplishing each of its three goals.

Previous renewable energy laws in Rhode Island have worked the way they were intended: to get National Grid to buy more and more of its electricity each year from clean, renewable energy sources. But Rhode Island’s previous renewable energy laws also had a significant flaw: they worked very well for big projects, like Deepwater Wind’s proposed offshore wind farm, but they worked less well for small projects (like a town that wants to set up a single wind turbine at its town hall, as Portsmouth did). That is because under the prior laws, developers would have to hire a small army of lawyers to negotiate an excruciatingly long, detailed contract with Grid, setting forth everything from the price of the electricity to delivery schedule. (For example, the contract that Deepwater filed with the Public Utilities Commission on December 10, 2009 ran 62 pages in length!)  Hiring lawyers to negotiate a 62-page contract was just too time-consuming and expensive for a developer who had a small project.

The new law fixed that problem. As the name of the law suggests, it provided for a “standard contract” for developers of small projects. The standard contract was short, written in plain English, and easy to understand. In addition, the law provided for a standard price to be paid, and established a mechanism for setting a fair price for each different type of project – wind, solar, and so forth. These prices were designed to be high enough to get projects actually built, but low enough to protect electricity rate-payers.

And that is exactly how the new law has worked. In the 15 months since the bill was signed into law, National Grid has held three separate sign-up periods. To date, 18 separate projects have been signed up.  Each of these 18 separate projects will be built right here in Rhode Island. Thus, Rhode Islanders will directly enjoy the environmental and economic-development benefits of these projects. The main purpose of the new law, to get more local renewable energy projects built, has been accomplished – in spades.

The developer of each of these 18 projects got a simple, standard contract to sign, and will receive a set price for the electricity produced.  Thus, another one of the law’s purposes has been accomplished.

The projects themselves are located in Providence, East Providence, Portsmouth, Lincoln, Westerly, Bristol, West Greenwich, East Greenwich, Hopkinton, Middletown, Cumberland, North Kingstown, North Smithfield, and West Warwick.  This geographical distribution of new renewable energy projects was a third purpose of the law.

Rhode Island’s new Distributed Generation Standard Contracts Act has been so successful that it is becoming a model for the rest of the country. Renewable energy advocates in New York and Iowa are hoping to replicate the Rhode Island law in their states. The California Public Utilities Commission has circulated the Rhode Island law to its in-house legal staff. A group of Oregon legislators is poised to introduce a bill in the coming legislative session modeled after the successful Rhode Island law.

The Distributed Generation Standard Contracts Act is a classic win-win. It addresses the problem of climate change by reducing the carbon emissions that cause climate change. And it helps the Rhode Island economy by facilitating local development of renewable energy projects.

This is a law that Rhode Islanders can be proud of. Its enactment reflects well on our legislators (who passed it unanimously) and on Governor Chafee (who signed it into law). The law has been administered carefully and diligently by our Office of Energy Resources. And National Grid, which receives an economic incentive when projects start producing power, has worked conscientiously with developers to help developers succeed.